Julie wanted a new interior color for her two-story home in Norristown, PA 19403. Water damage was also listed among her concerns, making ceiling preparation an important part of the project.
Jesus led the Tornambe Painting crew through the one-day wall and ceiling painting project, completed October 2, 2026. The crew identified oil priming the ceiling as the preparation step that made a difference.
The project centered on changing the wall color and repainting ceilings. Sherwin-Williams SW 6178 was the color recorded for the job, with a flat finish listed in the project details.
Preparation included filling nail holes, priming, masking windows and fixtures, and covering furniture. The crew reported no challenges during the work.
Project scope: Walls and ceilings in selected areas of Julie’s two-story home.
With water damage noted in the project concerns, the crew oil primed the ceiling before painting. The project notes identify this preparation as the step that made the biggest difference.
These photos show ceiling views before and after the work. Select a photo to view the full image.
Nail holes were filled before painting to prepare the walls for the new finish.
Priming was part of the preparation, with oil primer specifically used on the ceiling.
Windows and fixtures were masked, and furniture was covered during the painting work.
The wall and ceiling painting took one day. The project notes report that Julie was happy with the work, while also noting that a touch-up was needed.
The update brought together her request for a new color and the ceiling preparation included in the painting scope.
Julie wanted a new interior color. Water damage was also listed as a concern in the project details.
The reported painting scope included walls and ceilings. Doors, windows and trim were not listed as surfaces painted on this project.
The crew primed, filled nail holes, masked windows and fixtures, and covered furniture. Oil priming the ceiling was specifically highlighted in the project notes.
The painting project took one day and was completed October 2, 2026. A touch-up was noted as needed, and Julie was reported to be happy with the work.
Tell Tornambe Painting about the walls and ceilings you want to refresh, including any areas that need preparation before painting.