Collegeville PA Exterior Painting Project

Ambler Interior Painting Project

New Colors for BethAnn’s Ambler Home

BethAnn and her partner wanted new colors for their two-story home in Ambler, PA 19002. Tornambe Painting completed the interior painting project in one day, with Jesus leading the crew.

During the job, the homeowners added the foyer and downstairs hallway to the scope. The crew completed the work without reported challenges, and the homeowners were happy with the finished result.

Project Specifications

Paint, Finish and Project Scope

Manufacturer Sherwin-Williams
Paint Colors SW 6116 and SW 7734
Recorded Finish Flat
Homeowner’s Goal New interior colors
Surface Repairs Loose paint scraped and nail holes filled
Preparation Priming before painting
Protection Windows and fixtures masked; furniture covered
Added During the Job Foyer and downstairs hallway
Project Photos

Before and After: BethAnn’s Interior Painting Project

Browse the project photos below. Select any photo to open the full image.

The Project Story

A Color Refresh That Included a Little More

1

The Goal

BethAnn and her partner wanted to change their home’s interior colors. The project included walls, ceilings, trim, doors, windows and railings.

2

The Work

Jesus and the crew scraped loose paint, filled nail holes and primed. They also masked windows and fixtures and covered furniture before painting.

3

The Result

The homeowners added the foyer and downstairs hallway during the job. The project was completed in one day, and the homeowners were happy with the result.

Why Preparation Mattered

Filling Nail Holes Made the Difference

The crew identified filling nail holes as the preparation step that made the biggest difference on this project. Addressing those small imperfections helped prepare the surfaces for their new paint colors.

Scraping loose paint and priming were also part of the preparation, while masking and furniture covers protected nearby areas during the work.

Preparation Completed

  • Scraped loose paint
  • Filled nail holes
  • Primed surfaces
  • Masked windows and fixtures
  • Covered furniture
Interior Painting FAQs

Questions About BethAnn’s Project

How long did this Ambler painting project take?

The project was completed in one day, on September 27, 2026.

What surfaces were included?

The project scope included walls, ceilings, trim, doors, windows and railings. The homeowners also added the foyer and downstairs hallway during the job.

What paint colors and finish were used?

The project record lists Sherwin-Williams SW 6116 and SW 7734, with a flat finish. Individual room and surface color assignments were not specified.

What preparation made the biggest difference?

The crew identified filling nail holes as the preparation step that made the biggest difference. Preparation also included scraping loose paint, priming, masking windows and fixtures, and covering furniture.

Ambler Interior Painting

Ready for New Colors in Your Home?

Tell Tornambe Painting which rooms, hallways or interior surfaces you would like to refresh in your Ambler home.